Renovation Application

The Approval Process

Once your completed Application has been received it will be reviewed by the Strata Manager. Applications will be processed in a timely manner however depending on the nature of the works, the process could take up to 4-6 weeks. You will be contacted by the Strata Manager notifying you of the outcome.

If the application is not straightforward or there are items in the Application that require discussion, the Application may be deferred until the next-scheduled Strata Committee Meeting at which you may be asked to attend to present the Application and answer any questions. Please note that each individual building may have specific requirements and policies regarding renovations and our team will notify you if this is the case.

If you have any questions regarding the progress of your application, please contact us

Once Approved

Confirmation of formal approval will be provided to you by the Strata Manager.

Prior to proceeding with the Renovation, you must coordinate your renovation dates with the onsite Building Manager (if your building has one) or Strata Committee member so that (i) the Renovations may be coordinated with other work around the complex, (ii) neighbouring residents may be appropriately notified, and (iii) the elevators and loading areas booked (if applicable).

Please do not start your renovation without notifying your Strata Manager / Building Manager.

Some strata buildings require a Damage Bond be deposited prior to commencement of certain renovations. This covers any costs to repair common property if you or your contractors damage any part of common property during renovations.

You may also need to complete a Lift Booking form (if your building has a lift) which outlines the conditions you and your contractors must obey when carrying out works in the complex.

Once the renovation is complete, the Building Manager shall conduct a final inspection to check that the Renovation has been carried out in accordance with the Specifications outlined in your Application and Approval documentation to ensure that no damage has been done to common property.

A. Lot Owner

All fields are required in this section.

B1. Details of proposed renovations/works

All fields are required in this section.

B2. Works / contractor checklist

All fields are required in this section.
You must attach the following documents:

(Note: Plans must show that walls, doors or partitions will NOT be moved, removed or installed.)
(Note: Tradespeople (builders, carpenters, plumbers, electricians, tilers, etc) must be qualified.)
(Note: All contractors must hold public liability insurance.)

C. Installation of floorboards, tiles or hard floors

To prevent the transmission of noise between the apartments, all flooring must include an acoustic underlay and a report from an acoustic engineer on the product being used.

The minimum standard MUST be a 5 star rated product and the acoustic report must confirm the following:

  • L'nT,w + Ci no more than 45 dB inclusive (i.e. AAAC star-rating of 5) showing standards used (i.e. AS/NZS ISO 717.2 and AS/NZS ISO 140.7);
  • FIIC no less than 65 dB inclusive showing standards used (i.e. ASTM E989 and ASTM E1007)

You must attach the following documents:

D. Installation of additional air-conditioners

You must attach the following documents:

Certification that the air-conditioning unit will not exceed 50 dBA when operating at capacity

E. Bathroom / Kitchen Renovations

You must attach the following documents:

F. Declaration and Indemnity

By submitting this Renovation Application Form, the Owner(s) agrees to the following:

  1. The Owner warrants that all necessary permissions including building or planning permits have been obtained. (Note: Strata does not provide advice on regulatory obligations)
  2. The Owner indemnifies the Owners Corporation against-
    1. Any legal liability, loss, claim or proceedings in respect of any injury, loss or damage to the common property or to other property to the extent that such injury, loss or damage arises from or in relation to the Renovations;
    2. Any amount payable by way of increased insurance premiums by the Owners Corporation as a direct result of the Renovations;
    3. Any amount payable by way of increased fire safety compliance or local authority requirements as a direct result of the Renovations; and
  3. The Owner must, at the Owners cost:
    1. Properly maintain and keep the common property to which the renovation are erected or attached in a state of good and serviceable repair; and
    2. Properly maintain and keep the Renovations in a state of good and serviceable repair and must replace the Renovations (or any part of them) as required from time to time.
    3. Insure all works completed and make no claim on the Owners Corporation whatsoever regarding the Renovations
  4. If the Owner removes the Renovations or any part of the Renovations made under this Approval the Owner must at the Owners own cost, restore and reinstate the common property to its original condition.
  5. Any loss and damage suffered by the Owners Corporation or another lot owner as a result of completing the Renovations must be reimbursed to the affected party and may be recovered from the Owner as a debt due to the Owners Corporation or Owner upon demand with interest at the rate of 10% per annum until the loss and damage is made good.

PRIVACY STATEMENT: We are bound by the Privacy Act and will protect your personal information in accordance with the Australian Privacy Principles. These principles govern how we can collect, use, hold and disclose your personal information.